Al-Karameh Bridge
Work site: Amara province
Employer: Ministry of Municipalities and Public Works / General Directorate of Municipalities
The implementer: Al-Ezaa General Contracting Co. Ltd (main contractor)
Cost of the project: 46,829,242,000 Iraqi dinars.
Amount pillars: 230 (board piles)
Mold quantity: 44.364 square meters
Amount of rebar: 5,548.000 million kg
Amount of concrete: 65,330 cubic meters
Quierdr Box: 6114 square meters
bridge length A: 393.414 m / width of 9.9 meters
bridge length b: 311.845 m / width of 9.9 meters
Length of the road: 485 meters / width 18.5 meters
duration of Contract : 2 years