The Project of Design and Implementation of the second passageway of Basra – FAO in length of 25 km
work site: Basra Employer: the province of Basra – the General Directorate of Roads and Bridges Contractor: Al-Ezaa General Contracting Co. Limited (main contractor) cost of the project: 24,503,034,000 Iraqi dinars duration of the contract: 2 years